Modernization of equipment
Thanks to the professional level of qualification of the higher engineering and design staff at the plant, the design, development and modernization of equipment of any complexity are carried out.
The process of improving the equipment as a whole or its individual parts is ensured thanks to the following stages of work:
- formation of technical tasks;
- equipment testing;
- preparation of the modernization project;
- design development;
- preparation of technical documentation;
- drawing up an estimate;
- technical work on replacement or installation of new equipment elements;
- commissioning;
- testing of advanced equipment.
The process of modernization of equipment at «Dnipropetrovsk Foundry and Mechanical Engineering plant» has the following advantages:
- reduction of maintenance costs;
- reduction of downtime due to repair work;
- increase in productivity;
- guarantee of the quality of the work performed;
- service maintenance.
OUR CLIENTS
PJSC “Kyiv Cardboard and Paper Mill”, Obukhiv
"Lutsk Cardboard and Paper Mill" Ltd, Lutsk
LLC "Zhytomyr Cardboard Factory", Zhitomir, Stanishivskaya
Papir-Mal LLC, Malin
PRJSC "Izmail pulp and cardboard plant", Izmail
JSC “Dnipropetrovsk railway switch plant”, Dnipro
Podilsky cement JSC, Kamyanets-Podilskyi
PJSC "Malin Paper Factory Vajdmann", Malin
Zmiev Paper Factory LLC, Zmiev
OJSC Rubezhsky Cardboard and Container Plant, Rubezhnoye
LLC "ASS-Korostyshevskaya PF", Korostyshev
PJSC "Rogan Cardboard Factory", Rogan
LLC "Poninkovskaya CPF", Poninki
JSC "Kokhavinskaya PF", Gnizdichev
"Nikolaev Alumina Plant", Nikolaev
PJSC "Podolsky Cement", Kamenetz-Podolsky
"Kremenchug Steel Plant", Kremenchug
